Workshop Plant Repairs

Plant Maintenance & Workshop Repairs

Specialist structural maintenance and repair services for heavy plant and industrial machinery. Equipment is dropped off at our workshop and collected when the agreed work is complete.

Drop-off Workshop Repairs
15+ Years Experience
100% Compliance Led
Collection By Arrangement

Workshop-Based Plant Repairs

Our team assesses and repairs plant machinery at the Pratleys workshop. Customers arrange equipment drop-off and collection directly with us.

  • check_circleStructural welding and reinforcement
  • check_circleDamage assessment and repair planning
  • check_circleFabricated replacement components
Heavy plant machinery attachment in the Pratleys workshop
Industrial machinery undergoing workshop repair

Drop-Off & Collection Process

Bring the equipment to our workshop at an agreed time. We assess the work, complete the approved repair, and let you know when it is ready for collection.

local_shipping

Workshop Assessment

Our team inspects the equipment and confirms the repair scope before the agreed work begins.

health_and_safety

Collection by Arrangement

Once the repair is complete, we contact you so collection can be arranged from the workshop.

Planned Workshop Maintenance

Discuss planned workshop maintenance and recurring repair contracts with our team. We agree the work and timing around your equipment and operational needs.

calendar_month

Workshop Repair Assessment

We assess the condition of the equipment and discuss the repair work needed before agreeing the scope.

S355 Grade ISO 9001 EN 1090
engineering

Fabrication & Repair Planning

Discuss damaged components, replacement steelwork and fabrication requirements with our workshop team.

Recurring Workshop Repair Contracts

03

Planned Repair Support

Arrange workshop repairs and maintenance for your plant. All work is carried out at Pratleys; on-site repairs are not offered.

Industrial monitoring sensor mounted to steel

Technical Standards Compliance

Specification Certification Maintenance Interval Status
Primary Steel Structure BS EN 1090-2 12 months Critical
Vessel Pressure Testing PD 5500 / ASME VIII 24 months Standard
Weld Integrity (NDT) ISO 3834 6 months High Priority

Sign Up for Newsletters Be the First to Know. Sign up for newsletter today
Pratley's
Privacy Overview

This website uses essential cookies for core functions. Optional analytics and marketing cookies are used only with your consent. You can change your choices at any time.